A seven-storey social housing proposal at 8–30 Yorktown Parade in Maroubra is on public exhibition, and some neighbours say two weeks is too short to read it.
The NSW Planning Portal lists the application, SSD-147352238, as open from 25 November to 9 December 2026. Anyone can read the plans and lodge a formal submission there. The Environmental Impact Statement folder holds 29 files, next to a Notice of Exhibition.
What Homes NSW Wants to Build

Homes NSW proposes around 86 social homes in a seven-storey building. The development would replace 12 homes built in the 1970s, a net gain of about 74. The portal titles the project “affordable housing”, but Homes NSW describes the homes as social housing.
Homes NSW says residents would share outdoor space, a community room and bicycle storage. Its September newsletter described around 84 homes, so the count has changed since the early concept. Demolition of the three existing buildings won separate approval on 30 October under reference P5-2026-246. The new building still needs assessment. Homes NSW earlier said tenants would work with a relocation officer and expected moves by early 2027.
Homes NSW says more than 1,350 households in the Randwick local government area wait for social housing, including about 450 who need urgent help. The NSW Housing Register lists 73,121 households waiting statewide at 31 October, including 14,321 priority applicants. The statewide figure covers a much larger area than Maroubra.
Why Residents Want More Time
The state’s Community Participation Plan sets a 14-day minimum for this kind of residential project. NSW Planning says longer periods are possible. The sources reviewed give no project-specific reason for the dates.
Homes NSW reports five weeks of early engagement and 923 newsletters delivered. It says more than 110 people attended a drop-in at Lionel Bowen Library on 16 September, from 4:00 p.m. to 6:30 p.m. Earlier reporting recorded concerns that one weekday session was hard to reach. Attendance shows turnout. It does not show what most Maroubra residents think.
NSW Parliament records a 539-signature petition, tabled by Liberal MLC Chris Rath on 19 November. The petition register listed it as awaiting a response. The public petition page calls for longer consultation and a rethink of the building’s height. A separate campaign post urges an extension, preferably to the end of January, and at least two in-person sessions. It also criticises the transparency of the process. The petition’s exact wording has not been checked against the tabled text.
Shadows, Parking and Traffic Near Coral Sea Park

The site sits beside Coral Sea Park. Randwick City Council lists a playground, cricket nets, soccer fields and a full basketball court there. Homes NSW says early winter shadow testing showed shadow reaching a group of trees north of the basketball court and cricket nets. It also describes a nine-metre northern setback, fewer rear windows and solid balcony balustrades to limit overlooking towards Fitzgerald Avenue. The final shadow sheets sit in the exhibition for readers to check.
Council is running a separate consultation on an outdoor gym in the park’s north-western section, south of Yorktown Parade. Feedback there closes on 2 December. Published material reviewed does not show whether the proposed building’s shadow would reach that site.
Homes NSW’s November FAQ describes 48 basement spaces, including one for visitors. It gives preliminary estimates of 14 extra vehicle trips in the morning peak hour and 11 in the afternoon peak, compared with the existing site. Those figures cover weekday peaks. They do not say what happens on a Saturday when sport is on. A resident submission on an earlier application, SSD-71454960, described Yorktown Parade as sometimes impossible to drive down during park sport. That submission concerns a different project.
A separate approved project at 40–64 Yorktown Parade and 195–213 Fitzgerald Avenue will deliver 144 social and affordable homes. Homes NSW says construction traffic could overlap and that it will seek to coordinate traffic management. The FAQ figures do not make clear whether the 86-home estimates count the neighbouring homes.
How to Make a Submission
Submissions close on 9 December 2026. Go to the NSW Planning Portal application page, open the exhibited documents and choose “Make a submission”. The portal accepts submissions online only. Service NSW can help on 1300 305 695. As of 28 November, no extension or extra in-person session has been confirmed.
Published Date 28-November-2026










